ERE also operates in industrial facilities construction. Sivas Iron and Steel Mill, Furnace at Sivas Iron and Steel Factory, Milk Plant in Balgat Air Base are in this concept.

Sivas Iron and Steel Mill

During the construction of this 400,000tons/yr capacity mill with Turkey’s most modern technology, 900,000 m3 excavation, 750,000 m3 backfilling, 42,000 m2 formwork, 2,400tons reinforcement steel, 37,000 m3 concrete, 4,000 tons steel assembly and 36,000m2 aluminium covering and 27km water supply lines with 20 bar pressure had been erected.

Furnace at Sivas Iron and Steel Factroy

Furnace construction consisted of 450 tons of precise machinery installation and 500tons of technological steel construction production and installation.

Milk Plant in Balgat Air Base

This full-automatic plant has a 2,000lt/hr dairy products production and packing capacity. Pneumatically controlled system consists of milk, cheese, ice-cream, yogurt production and packing units and HTST pasteurisation system.

insaat_1