-
Birkapili HEPP Opening Ceremony, held on April 30th, 2004.
-
Our telecom operator arm ESER becomes the first privately-owned company to be granted Satcom Operator and Internet Service Provider licenses by the Turkish Telecommunication Authority
-
Final acceptance tests of one ILS system was completed in June 2003 and delivered to the Turkish Air Force in cooperation with THALES ATM Inc.
-
ERE Invites all participants to join Project Team which will present “Assess the Real Hydroelectric Potential of Turkey” (HYDROPOT) Project Proposal to EU 6th Framework Program for a research Fund. For detailed information, see HYDROPOT pages.
BIRKAPILI HEPP Opening Ceremony, April 30th, 2004
BIRKAPILI HEPP Opening Ceremony, April 30th, 2004
Works of ‘Sogutozu & Dagpazari Regulators and Birkapili HEPP’ which had commenced on October-2001 were completed on March-2004 and plant had started commercial opertion, following the Preliminary Acceptance on March 11th, 2004.
Opening Ceremony of the plant is held on April 30th, 2004, with the kind participations of Minister of Energy Dr. Hilmi GULER, Energy Market Regulatory Authority Chairman Mr. Yusuf GUNAY and Mr. Korkut OZAL alongwith a strong interest from protocol, local public and guests.
We would like to present our sincere gratitude to all our guests who honoured our ceremony with their attendance.
Photographs from the Opening Ceremony
Birkapılı HEPP Opening Ceremony
Members of the Protocol, during ceremony (from right to left);
· Dr. Hilmi GULER, Minister of Energy
· Mr. Yusuf GUNAY, Chairman of Energy Market Regulatory Authority
· Mr. Korkut OZAL
· Mr. Resat KOYMEN, Chairman of ERE Holding
Minister of Energy Dr. Hilmi GULER delivering his speech
ERE Holding Chairman Mr. Resat KOYMEN delivering his speech
ERE Holding Chairman Mr. Resat KOYMEN presenting a commemorative plaque to Minister of Energy Dr. Hilmi GULER
(from right to left) Chairman of Energy Market Regulatory Authority Mr. Yusuf GUNAY - Minister of Energy Dr. Hilmi GULER - Korkut OZAL during the ribon-cutting ceremony for opening of the plant
Birkapili HEPP, inside the plant
HYDROPOT Project
“Assessment of HYDROpower POTential of Turkey/Greece and Romania Using Innovative IT Approach” (HYDROPOT)
In collaboration with a number of universities, electricity distribution and trading companies and energy associations, ERE proposed a Specific Targeted Research Project (STREP) titled “Assessment of Hydropower Potential of Turkey/Greece and Romania Using Innovative IT approach (HYDROPOT) to EU within Sixth Framework Programme (FP6).
Project was proposed in the thematic priority area of ‘Aeronautics and Space’, ‘Sustainable energy systems’ and ‘Sustainable surface transport’ under the Call FP6-2004-TREN-3 on 8th December 2004.
The consortium of the project consists of a number of participants all of whom are experts in their own fields.
Aim of HYDROPOT
“Limit climate change and increase the use of clean energy” is the EU strategy for sustainable development. The development of new and renewable energy sources is the key change. Doubling their share in the energy supply quota from 6 to 12% and increasing electricity production based on these energy sources from 14 to 22% is an objective for 2010.
In this view, HYDROPOT addresses the problem of integration of renewable energy sources into energy supply chain. HYDROPOT aims at promoting energy efficiency/saving, increasing the share of production and use of cleaner energy sources with a reasonable price while reducing the environmental impact and providing a significant and quantifiable contribution to European policies in the field of new renewable energy sources.
This project will provide the IT based methodology for assessment of the economically feasible hydropower potential of any part of Europe in particular and of the world in general. For a brief outline of the project and what we intend to do, please see: Abstract of HYDROPOT.
We thank all participants for their efforts and co-operation in the preparation of the HYDROPOT proposal. We hope the proposal will be successful in the evaluation of European Commission and will be selected for possible funding.
N.Nadi Bakir – Co-ordinator of HYDROPOT
HYDROPOT Project Participants
‘Assessment of HYDROpower POTential of Turkey/Greece and Romania Using Innovative IT Approach’ Project; HYDROPOT
List of Participants:
Research Group | Group Leader |
ERE Energy Group Turkey |
N.Nadi Bakir Coordinator nbakir@ere.com.tr |
Bilkent University-Communications and Spectrum Management Research Center Turkey |
Hayrettin Koymen Member koymen@ee.bilkent.edu.tr |
Middle East Technical University- Water Resources Centre Turkey |
Dogan Altinbilek Chairing of the Technical Board hda@metu.edu.tr |
Istanbul Technical University-Hydraulics and Water Power Department Turkey |
Istemi Unsal Member unsal@itu.edu.tr |
National Technical University of Athens-Laboratory of Hydraulic Turbomachines Greece |
Dimitris Papantonis Member papan@central.ntua.gr |
Centre for Renewable Energy Sources Greece |
Michael Panagiotopoulos Member mpanag@cres.gr |
Societate Comerciala Pentru Cercetare, Proiectare, Executie, Montaj, Service Si Consultanta Pentru Echipamente Si Instalatii De Automatizare Si Tehnologia Informatiei Romania |
Gabriel Spiridon Member spiridon@ipa.ro |
National Institute of Hydrology and Water Management Romania |
Maria Cristina Trifu Member Cris.trifu@hidro.ro |
European Research Associates Belgium |
Giacomo Valentini Member gvalentini@erabrussels.be |
University of Leuven Belgium |
Kurt Deketelaere Member Kurt.Deketelaere@Law.kuleuven.ac.be |
Environment Park S.P.A Italy |
Federica Peirano Member federica.peirano@envipark.com |
Comite Scientifiaque et Technique des Industries Climatiques France |
Eric Michel Member e.michel@costic.com |
EN-SU Engineering and Consulting Co. Ltd. Turkey |
Hidayet Bukum Member hbukum@ttnet.net.tr |
ERE Turkey |
Erdal Ceyhan Member eceyhan@ere.com.tr |
University of Stuttgart Germany |
Fischer Matthias Member fischer@ikp2.uni-stuttgart.de |